GS Drop Down Table (Smart deployment system)

Our sales arguments are:

1. Cost reducing and time efficient compared to alternative methods.

2. Extend your tool-space for intervention services

3. Avoid complicate and heavy equipment packages

4. Improve you HSE and lower your operational risk.

5. Approved according to NORSOK D-010

6. SIM OPS

 

Specification:
  • Minimum Bore of 5.0” (125mm).
  • Capable of supporting 6Te of Tool String
  • Weight applied to/resting on Drop Plate.
  • Ability to be installed onto Riser when
  • Wireline already installed.
  • 9” OTIS type Quick Union Connection.
  • CE Approved Design and Manufacture .
  • Atex Approved Design and Manufacture.
Latest oil price